Post by mark on Aug 7, 2014 21:42:30 GMT -5
|
|
|
Post by ywevis on Aug 8, 2014 6:01:30 GMT -5
I thought they had riffles at the end for any pickers and nuggets?
|
|
|
Post by mark on Aug 8, 2014 6:21:09 GMT -5
This is a revision from the original design
|
|
|
Post by ywevis on Aug 8, 2014 6:29:58 GMT -5
I might like the original design, have they used it? I want to see video of the big rocks going all the way down the sluice.
|
|
|
Post by cabarrusgold on Aug 10, 2014 7:29:48 GMT -5
I experimented with a screen down the box and had mixed results. You must have enough volume of water to move that rock over the screen. When doing so, it moves the small stuff unless you can control the bottom area. I believe that is why Keene introduced that drop system in their 3 stage. Another idea is to drop and isolate. Keene did this too with double and triple sluices on bigger dredges.
|
|
|
Post by mark on Aug 10, 2014 8:07:33 GMT -5
There is a huge difference between a normal screen wire and the woven wire used on this dredge. The woven wire helps keep the rocks moving.
|
|
|
Post by cabarrusgold on Aug 11, 2014 6:08:30 GMT -5
Give it a try. It's only money.
|
|